FRAEW Opening-Up Works Across Multiple Buildings | DMC Group UK

DMC Group was appointed to carry out critical opening-up works across a portfolio of buildings to assist a Fire Engineer in assessing the condition and composition of external wall systems. These investigations enabled the preparation of detailed Fire Risk Assessments of External Walls (FRAEW), laying the groundwork for future remediation and compliance planning.

Project Overview

DMC Group worked with a Fire Engineer to inspect building façades. We carefully opened up parts of the external wall so they could be checked for fire safety. The work followed FRAEW (Fire Risk Assessment of External Walls) guidance.

Scope of Work

We carried out:

Careful removal of wall and façade parts

Access using scaffold towers and MEWPs

Support during fire safety inspections

Reinstating any areas after inspection

Clear records, including photos and site notes

Working closely with fire safety teams and the client

Supporting Fire Safety Checks

This work helped the Fire Engineer:

See how the wall was built

Find any flammable materials

Check for cavity barriers

Measure fire safety risk using PAS 9980

We worked quietly and carefully to avoid disturbing people in the building.

Outcome

The client received the data needed for a full FRAEW report. This helped them plan next steps for fire safety or cladding work. Our team made sure everything was safe, clear, and fully recorded.

Location
Liverpool
Duration
6 weeks