DMC Group was appointed to deliver cladding remediation works across multiple occupied high-rise residential buildings. This critical project involved the careful removal of combustible cladding from level 4 to ground and installation of temporary A1-rated cement board—executed with minimal disruption to residents and in full compliance with fire safety regulations.

Project Overview

This project involved urgent safety work on several tall residential buildings. DMC Group was asked to remove dangerous cladding from ground level up to level 4. We replaced it with safe, non-combustible cement board. This is a temporary solution while a full design is prepared.

Scope of Work

Our work included:

Removing unsafe cladding and insulation

Installing A1-rated cement board

Keeping residents informed and safe

Working on Residential Sites

The buildings stayed open while we worked. We followed strict safety rules to protect residents. Our team:

Managed noise and dust

Planned daily access clearly

Talked regularly with residents and managers

Safety and Compliance

The cement board we used is A1 fire-rated. All work followed MHCLG rules and the Building Safety Fund guidelines. We met the latest fire safety laws.

Outcome

The project finished on time and to a high safety standard. The buildings are now safer and ready for the final cladding system to be installed.